Construction Site Logistics Planning Software

Plan your site in 2D, 3D and 4D, and keep it current from mobilization to closeout.

cmBuilder 3D site logistics plan in context: building under construction inside a perimeter fence with a mobile crane, site trailers, laydown area, parking, two gates and the adjacent street

Why site logistics plans break down

The fix isn't more planning. It's a plan everyone can see, check and keep current.

How cmBuilder plans construction site logistics

Enter an address and get a 3D map of your site and its surroundings.

cmBuilder 3D map of a Miami tower site in context, with surrounding high-rises, roads and the waterfront

Import BIM models, 2D drawings and your schedule, or use the massing tool.

cmBuilder 3D site model next to the Project schedule panel listing milestones such as bulk excavation, concrete footings and slab pours

Place cranes, fence, trailers and laydown from 4000+ construction resources.

cmBuilder Measure Distance tool showing 18.25 m vertical clearance between a tower crane jib and the building roof

Lay out site access, truck routes, deliveries and street closures.

cmBuilder site logistics plan with a laydown area, temporary traffic control zone, pedestrian sidewalk scaffolding, two site gates and truck-route arrows on the street

Link resources to your schedule and watch the site change, phase by phase.

cmBuilder 4D phasing shown in four views of the same Miami site: excavation, structure, enclosure and the finished building

cmBuilder automatically quantifies elements through the phases of your project.

cmBuilder resource schedule listing site resources such as a tower crane, hoist, sanitation units and a concrete pump, with dates, durations and a timeline

Share a live link that opens in any browser, with no login.

cmBuilder live plan opened in a phone browser, showing the Bulk Excavation 1 step of the 4D timeline

Built for the field, the office and the city

Accurate enough to plan from

The auto-generated map gives you context, and your survey or drone scan data gives you existing conditions you can rely on. Near lot lines, setbacks and easements, your survey controls.

Ready for the people who sign off

Show owners, the city and the public each phase with access, gates, truck routes and road closures, and export any view as a PDF or PNG. Your traffic engineer or consultant finishes the formal submittal.

Site logistics planning for every team on the job

General contractors

Show owners how the job gets built, then run that plan in the field.

See visual planning for general contractors →

Preconstruction and estimators

Price your general conditions from the same plan you show the owner.

VDC and BIM teams

Place your models with local or EPSG coordinate systems and link them to your schedule for 4D.

Concrete subcontractors

Plan pours, crane picks and temporary works before pour day. Sequence pours by phase, plan truck access and pump placement, and show the GC exactly how your work gets done.

See visual planning for concrete subs →

Steel erectors

Plan lift sequencing, crane access and steel laydown before you mobilize, so conflicts are found before steel hits the site.

See visual planning for steel erectors →

Other specialty contractors

From demolition and earthworks to prefab and facade, plan sequencing, access and logistics before you mobilize.

How builders plan site logistics with cmBuilder

PCL Construction: $30–40M saved on a single project

“We saved $30 to $40 million and three months of schedule on a single project because we could validate a major change in less than a week.”

— Aaron Akehurst, Manager, Construction Services, PCL Construction

Read the PCL story →

Robins & Morton: 6 for 6 pursuit wins

“The last six project pursuits where I used cmBuilder, we've won. I've never been on a run like that before.”

— Mike Ruizzo, Manager of BIM and VDC, Robins & Morton

Read the Robins & Morton story →

RC Andersen: a full data-center campus logistics plan in 2 days

“When everyone involved already has foreknowledge of what could happen on site, it gives you the advantage from the beginning.”

— Brian Dover, BIM & Digital Coordinator, RC Andersen

Read the RC Andersen story →

John Holland: clear communication on complex builds

“When people can see the environment in 3D and understand it spatially, the message is clear without needing extensive explanation.”

— Warren Allan, Digital Engineering Manager, John Holland

Read the John Holland story →

Trusted by 100s of leading construction teams, including PCL · Robins & Morton · John Holland · RC Andersen · Gilbane · Hensel Phelps · McCarthy · Skanska · Clayco · Graham · EllisDon · JE Dunn · Naylor Love · BZI

All customer stories →

Site logistics planning FAQ

What is site logistics planning software?

It's software for planning how people, equipment and materials move in and around a construction site. In cmBuilder, you generate the site in context, place cranes, hoists, construction fence and laydown, link them to your schedule, and share the plan as a live 3D/4D model.

What should a construction site logistics plan include?

Site access and exits, haul roads and traffic flow, worker parking, laydown and storage areas, locations for tower cranes, material hoists and loading zones, and safety measures such as muster points and emergency vehicle routes. For a full walkthrough, read our guide to effective site logistics planning.

How do you create a site logistics plan in cmBuilder?

Enter your project address to generate the site, import your BIM model or 2D drawings (or use the massing tool), drag and drop resources from the library, then import your schedule and link activities to build the 4D sequence. Share it with a live link when it's ready.

Do I need a BIM model to plan site logistics in cmBuilder?

No. You can start from 2D drawings and use the built-in massing tool to create 3D buildings and site elements, then link them to your schedule for a full 4D simulation.

Which schedule and model files can I import?

Schedules from Primavera P6 (XER), Microsoft Project (MPP), XLSX and more; 3D models in IFC (2x3 and 4), Revit (RVT), STEP and FBX; and 2D drawings in PDF, JPEG and PNG.

Can I use cmBuilder plans for permit or municipal submittals?

It depends on your local building, zoning and engineering departments, because they decide what a submittal needs. Many teams use cmBuilder to build the logistics base plan, show phases, access, truck routes and road closures, and export views as PDF or PNG. A traffic engineer or consultant then finishes any formal drawings the authority requires. For anything near lot lines or setbacks, your survey controls.

We already use Bluebeam or SketchUp. Why switch?

Markups and static models show one moment in time. cmBuilder puts a 3D/4D logistics plan on your real site in context, links it to your schedule so every phase is visible, and gives everyone one live link that always shows the latest version, with no login and no software to install.

Can owners and subcontractors view the plan without a cmBuilder account?

Yes. Anyone with a shared link can view the live plan in a browser, including on a phone or tablet, with no login required. The link is view-only and always shows the latest version. Performance on mobile depends on the size of the scene.

See your site logistics plan before you build it

Book a customized demo and see how your team can plan cranes, access, laydown and phasing in 3D and 4D, then keep one live plan current for everyone on the project.