Blog | cmBuilder.io

Learn about cmBuilder product updates, get insights on the digital project delivery, and our take on the construction industry as a whole.

Case Study
Helio Monteiro from Venture on replacing a 3-product workflow with cmBuilder.io as a single platform for site logistics planning and simulation

We sat down with Helio Monteiro, Director of VDC at Venture General Contracting and spoke to him about digital construction strategies at Venture, testing and adopting new software for site utilization planning. While discussing cmBuilder, he explained how the platform brings about a different approach to their workflow and can also help tackle site logistics, safety and traffic control in the various phases of planning, with increased collaboration with the project teams.

read more
Case Study
ETRO Construction saves time & adds value to their clients with 4D simulations on accessible, intuitive, web-based platform cmBuilder.io

ETRO Construction uses cmBuilder in proposals to easily show the challenges or issues via a 4D site logistics simulation. What would otherwise have taken them 3 or more days to create on other BIM/simulation software now takes them 3 hours to create on cmBuilder and also shows their prospective client the level of detail and thought they’ve given to the specific project.

read more
Case Study
Haycon reduces 3-day site logistics planning cycles to under 4 hours with rapid 4D simulation using cmBuilder.io

Haycon Inc uses cmBuilder.io to reduce site logistics planning cycles to less than half a day and finds a scalable, low-effort, and high-value web-based solution to get a more accurate overall view of their construction planning with regards to moving around the site, placing large equipment, getting things delivered up into the building efficiently and safely.

read more
Case Study
No Ordinary Park! How Smith Bros. & Wilson (BC) Ltd. Deployed a Digital Construction Twin to Enhance Collaboration and Push the Integration of Construction Technology

Smith Bros. & Wilson (BC) Ltd. (SBW) uses the Digital Construction Twin solution offered by CadMakers as a proactive tool to help identify and mitigate project risks while allowing for effective project team communication. CadMakers’ tools allowed the proposal of solutions to complex geometries and construction sequencing, prior and even during construction. To date, the Digital Construction Twin solution has allowed SBW to perform a virtual construction study and get ahead of coordination complexities that would be found later on-site. The Digital Construction Twin solution also helped SBW run 4D sequencing simulations to optimize the scheduling on-site, integrate trade coordination and shop drawing reviews, and layout various building elements on-site directly from the model.

read more